Interface Studio

S09.1 — Marti BI / Strategy

Abacus provides · access method odbc

Route

Abacus
system
→
MIP / DWH
system
contract holder
The intermediate is the contract holder, not a waypoint — our obligation ends there. A stage may legitimately carry no fields at all.

Delivery scopes

PhaseScopeRowsEndpointsDescription
1 KMU 259 30 Phase 1 - KMU Mandant Workbench
2 KONZERN 831 62 Phase 2 - Konzern Mandant Workbench
Endpoint counts are derived — COUNT(DISTINCT EndpointId) over the rows in scope. Nobody types them, so they cannot drift.

Validation

105
target field missing
Findings are derived, not typed: the spec holds requirements and the DWH/MIP catalogue validates them. The source workbook maintains these by hand as DWH: zu erstellen.

Endpoints

EndpointRows
D_ABGRENZUNG 12
D_ABRECHNUNGSKREIS 5
D_ABTEILUNG 5
D_ADRESSE 13
D_ADRESSE_DELTALOAD 6
D_ANLAGE 30
D_ARTIKEL 20
D_BUCHUNGSGRUPPE_DEBITOR 7
D_BUCHUNGSGRUPPE_KREDITOR 7
D_BUCHUNGSOBJEKT 11
D_DEBITOR 13
D_DEBITORENPOSTEN_BEMERKUNG 4
D_DOKUMENT_KALK 11
D_EINHEIT 3
D_GERAET 5
D_GERAET_GRUPPE 14
D_HERKUNFT 3
D_KONTO 19
D_KOSTENART 13
D_KOSTENART_GRUPPE 14
D_KOSTENSTELLE 15
D_KOSTENSTELLE_ABTEILUNG 4
D_KOSTENSTELLE_BEREICH 4
D_KOSTENSTELLE_SPARTE 4
D_KREDITOR 14
D_LEISTUNGSART 9
D_LEISTUNGSART_GRUPPE 11
D_NACHTRAG_PLANVERSION 2
D_NACHTRAG_STATUS 2
D_NACHTRAG_TYP 2
D_ORG_LVL_7_ORGANISATION 10
D_ORG_LVL_8_ERP_MANDANT 18
D_PERSONAL 13
D_PROJEKT 49
D_PROJEKT_ABTEILUNG 4
D_PROJEKT_BEREICH 4
D_PROJEKT_GESCHAEFTSFELD 4
D_PROJEKT_KALK 22
D_PROJEKT_SEGMENT 4
D_PROJEKT_SPARTE 5
D_STRUKTURKOSTEN_KATEGORIE 6
D_VERBINDUNG_LEISTUNGS-KOSTENART 7
D_WAEHRUNG 3
F_ANLAGE_POSTEN 15
F_ARBEITSZEIT_KALK 15
F_ARTIKEL_POSTEN 16
F_ARTIKEL_PREIS 9
F_AUSMASS_POSITIONEN_KALK 24
F_AUSMASS_ZEILE_KALK 32
F_BEBU_BUCHUNG 33
F_BEBU_KUM 6
F_BEBU_PLAN 20
F_BEBU_SALDO 18
F_FIBU_BUCHUNG 29
F_FIBU_DEBITORENPOSTEN 36
F_FIBU_KREDITORENPOSTEN 38
F_GERAET_POSTEN 16
F_HR_BUCHUNG 6
F_KALKULATION_KALK 32
F_LIEFERSCHEINE_KALK 20
F_RECHNUNGEN_KALK 9
F_REGIE_KALK 23
F_TAGESRAPPORT_KALK 27
F_TRX_ZUSCHLAG 8